Orleans Conservation Commission
Work Meeting Nauset Room October 22, 2013
8:30 a.m. Call to Order
Continuations
Last Heard 10/15/13 (JT1)
Jean & Thomas Russell 74 & 75 Viking Road
by East Cape Engineering, Inc. Assessor’s Map 63, Parcel 54, & Assessor’s Map 70, Parcel 31. The proposed nourishment and stabilization of a Coastal Bank. Work will occur on a Coastal Bank, Coastal Beach, Land Subject to Coastal Storm Flowage, & in the Pleasant Bay A.C.E.C.
Last Heard 10/15/13 (JT1)
William Gaughan 40 Winslow Drive
by JC Ellis Design, Inc. Assessor’s Map 91, Parcel 44. The proposed upgrading of an existing septic system including the pumping & abandonment of the existing system. Work will occur within 100’ of the Edge of a Bordering Vegetated Wetland, Uncle Seth’s Pond, & the Pleasant Bay A.C.E.C.
Last Heard 10/15/13 (JT1)
Michael & Patricia Schumaecker 161 Monument Road
by JC Ellis Design, Inc. Assessor’s Map 55, Parcel 58. The proposed expansion of an existing deck. Work will occur within 100’ of a Bordering Vegetated Wetland, Coastal Bank, & Pilgrim Lake.
Last Heard 10/15/13 (JT1)
Elizabeth Ann Sanders Irrevocable Trust of
April 9, 1999, & Charles A. Sanders 3 South Little Bay Road
by East Cape Engineering, Inc. Assessor’s Map 82, Parcel 6. The proposed stabilization of a Coastal Bank. Work will occur on a Coastal Bank, Land Subject to Coastal Storm Flowage, & the Pleasant Bay A.C.E.C.
Last Heard 10/15/13 (JT1)
John F. McCoy 20-23 Preservation Path
by Ryder & Wilcox, Inc. Assessor’s Map 24, Parcels 100 & 104. The proposed upgrading of an existing septic system including the pumping & abandonment of an existing leaching field, & the installation of a new septic system to serve an existing single-family dwelling. Work will occur within 100’ of a Salt Marsh, Coastal Bank, & Land Subject to Coastal Storm Flowage.
Revised Plan
John Whitesides 22 Franz Road
The proposed construction of a new foundation and first floor, the reuse of the existing house as the second floor and roof, and the construction of a patio has been revised to no longer use the existing house. Work will occur within 100’ of a Coastal Dune.
Certificate of Compliance
Richard E. Dupont (2010) 18 Sages Way
The request for a Certificate of Compliance for an Order of Conditions for the removal of an existing dwelling including abandonment of the septic system and construction of a new dwelling and septic system.
William B. & Diane C. Richardson (2008) 17 Rock Harbor Road
The request for a Certificate of Compliance for an Order of Conditions for the removal of an existing barn and greenhouse; construction of a dwelling with septic components; and construction of a porch.
Administrative Reviews
Kris Ramsay/OCT 20 Cheney Road
The proposed mowing of an early successional field habitat, including the cutting of invasive vines from oak and cherry trees, and the cutting of invasive shrubs 6 inches from the ground. Work to be done by Billingsgate Land Management.
Richard DeMorias 14 Sea Breeze Lane
The proposed removal of locust trees on an unbuildable lot. Work to be done by Meredith Landscape Company.
Paul Ware 15 Barley Neck Road
The proposed construction of a handicapped ramp, a set of steps, and the removal of one bush. Work to be done by Tom Hague III Builder.
Pine Ridge Realty Trust 24-26 Pine Ridge Lane
The proposed removal of 2-3 damaged trees, removal of 2 shrubs, removal of 1 oak limb and the pruning of an oak tree. Work to be done by various contractors.
Vote of Support
Kris Ramsay/OCT 24 Twinings Lane
The Orleans Conservation Trust is looking for a vote of support from the Orleans Conservation Commission relating to the gift of a perpetual Conservation Restriction at 24 Twinings Lane from Ann Fleck- Henderson to the Orleans Conservation Trust
Chairman’s Business
Approval of the Minutes from the Meeting on October 8, 2013
Other Member’s Business
Administrator’s Business
Site Visits
Town of Orleans Hubler Lane
Assessor’s Map 38, Between Parcels 15, 16-1, 16-2, 16-3, 17, & 18. The proposed construction of a gravel access road to the public beach within the existing road layout including drainage improvements & restoration with native plantings. Work will occur within 100’ of the Top of a Coastal Bank & within the Pleasant Bay A.C.E.C.
Town of Orleans 239 Beach Road
Assessor’s Map 14, Parcel 11. The proposed construction of a semi-open air pavilion addition to the existing Nauset Beach Administration Building. Work will occur within 100’ of a Coastal Dune, Coastal Beach, & Land Subject to Coastal Storm Flowage.
Cynthia A. Kawie 36 Gibson Road
by Ryder & Wilcox, Inc. Assessor’s Map 19, Parcel 22. The proposed construction of a screen porch on an existing deck; proposed extension of a deck; installation of an outdoor rinse area; & removal & replacement of existing stairs on a Coastal Bank. Work will occur within 100’ of a Coastal Bank, & on a Coastal Bank & on Land Subject to Coastal Storm Flowage.
Todd G. & Robin B. Thayer 82 Arey’s Lane
by Ryder & Wilcox, Inc. Assessor’s Map 62, Parcel 89. The proposed pumping & abandonment of an existing septic system & the installation of a new septic system to serve an existing single-family dwelling. Work will occur within 100’ of an Inland Bank on Pilgrim Lake, Top of a Coastal Bank, Edge of Wetland, Land Subject to Coastal Storm Flowage, & within the Pleasant Bay A.C.E.C.
Daniel & Andrea Schmieg 13 Kingsbury Lane
by Ryder & Wilcox, Inc. Assessor’s Map 71, Parcel 1. The proposed reconstruction of an existing boathouse; stabilization of an eroding bank; replacement of failing fiber rolls with gabion/fiber roll toe protection; removal of invasive plant species, & plant with native species. Work will occur on a Coastal Bank, on a Coastal Beach, on Land Subject to Coastal Storm Flowage, & within the Pleasant Bay A.C.E.C.
Michael Levangie & Sandra Lucchesi 55 Freemans Lane
by Ryder & Wilcox, Inc. Assessor’s Map 5, Parcel 31. The proposed construction of a sunroom, swimming pool, & patio has been Amended to show a larger sunroom, a new kitchen addition, & a reduction in patio. Work will occur within 100’ of a Coastal Bank & Land Subject to Coastal Storm Flowage.
Charles Silbert 30 & 34 Viking Road
by Coastal Engineering Company, Inc. Assessor’s Map 70, Parcels 23 & 24. The proposed clearing of vegetation, minor grading, & installation of a new driveway from Viking Road to #34 Viking Road. Work will occur within 100’ of the Top of a Coastal Bank.
Robert & Nancy Burkert 7 Harbor View Lane
by Environmental Landscape Consultants, LLC. Assessor’s Map 28, Parcel 155. The proposed removal of turf & privet hedge & revegetation with native plants. Work will occur within 100’ of a Bordering Vegetated Wetland & Critchett’s Pond.
The listing of matters are those reasonably anticipated by the Chair which may be discussed at the meeting. Not all items listed may in fact be discussed and other items not listed may also be brought up for discussion to the extent permitted by law.
|